UP TO 1 MW · MYANMAR
Size a solar system for your site
Enter daily energy, peak demand and backup needs. Compare an indicative array, inverter and LiFePO₄ battery against your selected site's solar resource.
Site & demand
Indicative system
Solar resource by month
NASA POWER monthly GHI · estimated daily PV output at 78% performance ratio
Circuit calculations
Compare per-MPPT current and string limits with the exact inverter datasheet. Rear-side gain needs a separate current review.
NEXT STEPS
Select equipment and quantities
Planning quantities update with the PV array and backup requirement. Confirm exact models and wiring on site.
Inverter selection
STEP 03 RESULT
Inverter capacity & PV inputs
LiFePO₄ battery
Uses the backup load and hours from Step 01 and the inverter selected in Step 03.
Set series/parallel wiring only after confirming module voltage, BMS limits and the inverter battery port.
STEP 04 RESULT
Battery capacity & backup
Cable schedule
STEP 05 RESULT
Cable quantities
Cable choices are a length and quantity schedule, not approved cross-sections. Verify ampacity, installation derating, voltage drop, fault protection and string design. Battery power cable depends on the selected system voltage and BMS.
Protection & earthing
Uses the PV strings, MPPT assignment, inverter fleet and cable routes from Steps 01–05.
These are route and device-position allowances. Select device ratings, PE size and electrode design after fault, lightning, soil and local code review.
Rail and attachment quantities assume two rails per row, 20 mm module gaps and 100 mm rail overhang at both ends. Confirm module clamp zones, roof structure, wind loads, waterproofing and manufacturer spans before ordering.
STEP 06 RESULT
Protection positions & earth route
Equipment & design checks
A shortlist to take into detailed engineering and procurement.
Calculation basis
Myanmar solar resource
Monthly average daily GHI (kWh/m²/day). Annual PV output (kWh/year) follows the current array; annual GHI is kWh/m²/year.
Source: NASA POWER long-term climatology, ALLSKY_SFC_SW_DWN. Annual total sums monthly daily averages × calendar days. Magway and Chauk, and Hpa-An and Mawlamyine, share source grid cells. GHI is a horizontal resource; actual array yield depends on tilt, weather, shade and system losses.